1

High-Efficiency 400 kW Chiller Installation Secures £50,000 Yearly Cost Reduction on Energy and 200 Tonnes CO₂ Saving

News Discuss 
Installation Overview Newsome has successfully finalised the installation and commissioning of a high-performance 400 kW chiller at a well-known confectionery manufacturing site in York. Designed to advance ESG targets, the installation boosts system dependability while minimising overall power consumption and CO₂ levels. https://lingeriebookmark.com/story10684815/advanced-400-kw-chiller-installation-secures-50k-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-cut

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story